【单选题】【消耗次数:1】
2.Thewatchis________.
Jims
Jimswatch
Jims
the Jims watch
参考答案:
复制
纠错
相关题目
【单选题】 _________ the news of Jims death, the old medical officer was proud of his daughters boyfriend.
①  At
②  On
③  In
④  Of
【单选题】 —______ model plane is this?—I think its Jims. Look,his name is on it.
①  Who
②  What?@Whose
③  Where
【简答题】 2.给下列词加上适当后缀构成形容词。watch[填空(1)]storm[填空(2)]system[填空(3)]theory[填空(4)]
【单选题】 When he was a boy, he used to go there and watch ____.
①  to repair bicycles
②  bicycles to be repaired
③  bicycles being repaired
④  repairing bicycles
【单选题】 Watch out, the boss is disguised _____ your behavior.
①  to
②  at
③  for
④  with
【单选题】 When he was a boy,he used to go there and watch________.
①  to repair bicycles
②  bicycles to be repaired
③  bicycles being repaired
④  repairing bicycles
【单选题】 I often watch [填空] TV in [填空] evening.
①  a,the
②  an,the
③  /,the
④  /,a
【单选题】 I____ a very old watch in my uncles house.
①  came to
②  met with
③  came across
【单选题】 1.When hewas a boy, he used to go there and watch____.
①  to repair bicycles
②  bicycles to be repaired
③  bicycles being repaired
④  repairing bicycles
【单选题】 What is referred to if we say “see a movie, watch a play, look at a picture”?
①  denotative meaning
②  connotative meaning
③  collocations
④  synonyms.
随机题目
【单选题】 下列施工组织设计的内容中,属于施工部署及施工方案的是
①  施工资源的需求计划
②  施工资源的优化配置
③  投入材料的堆场设计
④  施工机械的分析选择
【单选题】 单位工程在平面或空间上施工的开始部位及展开的方向称
①  施工顺序
②  施工程序
③  施工流程
【单选题】 成倍节拍流水,实质是通过对流水节拍大的施工过程相应增加施工班组而组织成步距和节拍相等的流水方式,比较适合于
①  分部工程
②  道路、管道工程
③  单位工程
【判断题】 施工组织设计是用来指导拟建工程施工全过程的综合性文件,它的核心是施工方案。
①  正确
②  错误
【判断题】 对施工进度计划进行检查的目的在于使施工进度计划的初始方案满足规定的目标。
①  正确
②  错误
【单选题】 在网络计划中,总时差最小的工作称
①  关键工作
②  非关键工作
③  一般工作
【单选题】 不仅为单位工程开工前做好准备,而且还要为分部工程的施工做好准备的施工准备工作称为
①  施工总准备
②  单位工程施工条件准备
③  分部工程作业条件准备
【单选题】 关于双代号网络图绘图规则的说法,正确的是
①  箭线不能交叉
②  只有一个起点节点
③  关键工作必须安排在图面中心
④  工作箭线只能用水平线
【单选题】 单位工程施工组织设计的核心是
①  施工方案
②  施工进度计划
③  施工平面布置
【单选题】 对单代号网络图编号说法正确的是
①  编号可不必标注在节点内
②  号码可重复、可间断
③  一项工作必须有唯一的节点和相应的编号