【单选题】【消耗次数:1】
7. Does ________ matter if he cant finish the job on time?
this
that
he
it
参考答案:
复制
纠错
相关题目
【单选题】 He will surely finish the job on time _______ he is left to do it in his own way.
①  in that
②  in case
③  as far as
④  so long as
【单选题】 He’s determined to finish the job __________ long it takes.
①  no matter
②  however
③  wherever
④  whatever
【单选题】 he tried [] but failed to finish his work in time.
①  hard
②  hardly
【单选题】 He has a part-time job ( ) shelves in the local supermarket.
①  stock
②  stocked
③  stocks
④  stocking
【单选题】 He the job well,but he so careless.
①  could do,was
②  had done,had been
③  could have done,was
④  hadnˊt done,had been
【单选题】 He the job well,but he so careless.
①  could do,was
②  had done,had been
③  could have done,was
④  hadnˊt done,had been
【单选题】 2. As time went on, he found himself ____ with the toughest job she had ever taken.
①  face
②  faced
③  facing
④  to face
【单选题】 He cannot ____ a car, for he does not earn much money.
①  obtain
②  afford
③  donate
④  consume
【单选题】 He is ( ) to his job.
①  dedicated
②  decided
③  devoted
④  delighted
【单选题】 7. My uncle __________ to see me. He’ll be there soon.
①  comes
②  is coming
③  had come
④  came
随机题目
【单选题】 不能认定为工伤的是()。
①  患职业病
②  上班途中受到机动车事故伤害的
③  醉酒导致伤亡的
④  在工作时突发疾病死亡的
【单选题】 易消除的因素为()
①  系统性因素
②  偶然性因素
③  随机性因素
④  变异性因素
【单选题】 直观的进度计划方法。
①  横道图
②  单代号网络图
③  双代号网络图
④  时标网络计划
【单选题】 已完工作实际费用,可用符号()来表示。
①  BCWP
②  BCWS
③  ACWP
④  ACWS
【单选题】 工程质量事故造成重伤3人以下或直接经济损失在10万元以下的事故为()
①  小事故
②  一般事故
③  未遂事故
④  重大事故
【单选题】 设计质量控制的依据中,体现项目发包人的建设意图的文件资料之一是()。
①  设计规范、规程
②  项目评估报告
③  选址报告
④  设计纲要
【单选题】 建设工程项目管理各参与方的工作任务中,最重要的任务是()。
①  投资控制
②  质量控制
③  合同管理
④  安全管理
【单选题】 根据《建设项目工程总承包管理规范》(GB/T50358-2005)的有关规定,工程总承包管理应包括()和工程总承包企业职能部门参与的项目管理活动。
①  业主方的项目管理活动
②  分包商的项目管理活动
③  总承包企业项目部的项目管理活动
④  材料供应商的项目管理活动
【单选题】 网络计划中某项工作进度拖延的时间为6天,该工作的总时差为5天,自由时差为2天,则该工作影响总工期()
①  1天
②  2天
③  4天
④  6天