【单选题】【消耗次数:1】
The bridge which ________last year looks really beautiful.
was built
built
was set up
had been built
参考答案:
复制
纠错
相关题目
【单选题】 The bridge which ________ last year looks really beautiful.
①  was built
②  built
③  was set up
④  had been built
【判断题】 The cinema is built last year.
①  正确
②  错误
【判断题】 A new bridge has been built on Xinan River.
①  正确
②  错误
【单选题】 he park has been built and it will be open _____ three years
①  A. in
②  B.for
③  C.on
④  D.after
【单选题】 Modern machinery _______ been installed in this newly-built factory.
①  has
②  have
③  is
④  are
【单选题】 They have built a____.?
①  bridge hundred meters ?
②  bridge a hundred meters long?
③  a hundred meters long bridge ?
④  bridge hundred meters long?
【单选题】 Sports and leisure centres are[填空] built.
①  be
②  been
③  /
④  being
【单选题】 A hospital was built [填空] the railway station.
①  on
②  near
③  next to
④  in
【单选题】 The museum_______built two years ago.
①  has been
②  was
③  is being
【单选题】 We built the house ______. Nobody helped us.
①  ourselves
②  ours
③  myself
④  mine
随机题目
【单选题】 儿童2.5岁-3岁时脑重约900-1011克,达到成人的( )。
①  100%
②  75%
③  90%
④  50%
【单选题】 前运算阶段儿童开始借助( )进行思维。
①  想象
②  知觉
③  表象
④  感觉
【单选题】 社会性微笑出现在( )。
①  3-4周
②  0-5周
③  六个月
④  一个月
【单选题】 下列( )不是婴儿情绪的特点。
①  易隐藏
②  易变换
③  易感染
④  易暴露
【单选题】 当一个人感受到对方的某种情绪时,他自己也能体验到相应的情绪,称为( )。
①  移情
②  转移
③  共鸣
④  传递
【单选题】 ( )是指儿童未来达成同一目标或满足同一需要,在合作中一起游戏。
①  联合游戏
②  合作游戏
③  独自游戏
④  平行游戏
【单选题】 项目管理的核心任务是项目的 ( )
①  目标控制
②  合同管理
③  风险管理
④  组织协调
【单选题】 业主方的项目管理工作涉及项目实施阶段的全过程,竣工验收属于建设工程项目的( )阶段。
①  设计准备
②  动用前准备
③  施工
④  决策
【单选题】 建设工程项目的全寿命周期不包括( )。
①  决策阶段
②  使用阶段
③  控制阶段
④  实施阶段
【单选题】 设计、采购和施工任务综合承包,即EPC承包,它们的项目管理属于( )的项目管理。
①  设计方
②  建设项目工程总承包
③  施工方
④  业主方