【单选题】【消耗次数:1】
Great changes __________ in our institute in the last few years.
have taken place
has taken place
took place
had taken place
参考答案:
复制
纠错
相关题目
【单选题】 It is an ____ change that has taken place.
①  amazing
②  attempting
③  awaking
④  amusing
【单选题】 Its the second time that I __________ in Shanghai ! What great changes have taken place in Shang Hai. It is ten years since I __________ it last time.
①  have been ; left
②  had been ; left
③  have been ;had left
④  went ;had left
【单选题】 Big changes have taken place at Marketing Department the new manager came.
①  before
②  after
③  since
④  while
【判断题】 Plastics has taken the place of many other materials.
①  正确
②  错误
【单选题】 ____ the diamond, he had to look for a place to hide it.
①  Having stolen
②  Having been stolen
③  Stolen
④  Stealing
【单选题】 ________the diamond,he had to look for a place to hide it.
①  Having stolen
②  Having been stolen
③  Stolen
④  Stealing
【单选题】 The young man struggled to _______ where he was at the time the murder took place.
①  reduce
②  respond
③  respond
④  recall
【单选题】 The young man struggled to _______ where he was at the time the murder took place.
①  reflect
②  respond
③  resolve
④  recall
【单选题】 4.____the diamond, he had to look for a place to hide it.
①  Having stolen
②  Having been stolen
③  Stolen
④  Stealing
【单选题】 A new teacher was sent to the village in place of ____ one who had retired.
①  a
②  the
③  an
④  Its
随机题目
【判断题】 网络中通常只允许出现一条关键线路。
①  正确
②  错误
【单选题】 网络计划中,工作最早开始时间应为( )。
①  所有紧前工作最早完成时间的最大值
②  所有紧前工作最早完成时间的最小值
③  所有紧前工作最迟完成时间的最大值
④  所有紧前工作最迟完成时间的最小值
【单选题】 在组织流水施工时,通常施工段数目m与施工过程数n之间的关系应该是( )。
①  m≥n
②  m≤n
③  m=n
④  无关系
【单选题】 下列( )说法是错误的。
①  总时差为零的工作是关键工作
②  由关键工作组成的线路是关键线路
③  总时差为零,自由时差一定为零
④  自由时差是局部时差,总时差是线路性时差
【单选题】 在劳动量消耗动态曲线图上允许出现( )。
①  短期高峰
②  长期低陷
③  短期低陷
④  A和B
【单选题】 网络计划的缺点是( )。
①  不能反映工作问题的逻辑
②  不能反映出关键工作
③  计算资源消耗量不便
④  不能实现电算化
【多选题】 下列( )参数为工艺参数。
①  施工过程数
②  施工段数
③  流水步距
④  流水节拍
【单选题】 选择每日工作班次,每班工作人数,是在确定( )参数时需要考虑的。
①  施工过程数
②  施工段数
③  流水步距
④  流水节拍
【单选题】 施工场地周边有无汽车维修厂,属于( )。
①  能源调查
②  交通调查
③  材料调查
④  半成品及成品调查
【单选题】 冬季施工时,混凝土冷却到( ),才能拆除模板。
①  0℃
②  5℃5
③  10℃
④  15℃