【单选题】【消耗次数:1】
It’s ( )to arrive at 5:30 pm local time…
schedule
scheduled
scheduling
to scheduled
参考答案:
复制
纠错
➡️如需代学继续教育,联系微信:yizhituziang

相关题目
【单选题】 The delegation is scheduled to ( ) tomorrow at 8:00 a.m.
①  decrease
②  depart
③  contribute
④  apart
【单选题】 He has a part-time job ( ) shelves in the local supermarket.
①  stock
②  stocked
③  stocks
④  stocking
【单选题】 I give you my word that the books wil arrive [填空]time.
①  on
②  for
③  at
④  in
【单选题】 Hardy’s local-colored works are known as “novels of character and _____.”
①  personality
②  nature
③  domestic life
④  environment
【单选题】 It’s time for Meimei and ______ to the Palace Museum.
①  I going
②  I to go
③  me going
④  me to go
【单选题】 It’s hot now. It’s time to ___your warm clothes in the wardrobe.
①  put on
②  put away
③  take off
④  give back
【单选题】 19.It’s time he_____ a good rest.
①  has
②  will have
③  had
④  must have
【单选题】 It’s sunny today. It has stopped ______ for a long time.
①  raining
②  to rain
【单选题】 Tom: It’s the most delicious fruit I have had a long time.
①  I’m so glad you like it.
②  You are not hungry now.
③  I like eating this fruit, too.
④  You should like it.
【单选题】 Don’t hesitate ______ for help if you have any problem meeting the schedule.
①  to ask
②  asked
③  asking
④  to be asked
随机题目
【单选题】 改变项目计划,使项目目标不受某个风险的影响,是( )
①  风险缓解
②  风险规避
③  风险转移
④  风险接受
【单选题】 风险管理的工作流程不包含( )。
①  风险识别
②  风险分析
③  风险控制
④  风险消除
【判断题】 编制工作分解结构没有唯一正确的方法。( )
①  正确
②  错误
【判断题】 应选择网络计划图上总工期最短的那条路径作为关键路径。( )
①  正确
②  错误
【判断题】 项目的关键路径一定是唯一的,也不可能发生变化。( )
①  正确
②  错误
【判断题】 资源平衡是用资源的限制去调整用关键线路法编制出来的项目进度计划,使之切实可行。( )
①  正确
②  错误
【判断题】 “质量是免费的”这句话是有道理的,因为质量成本可以用不合格成本来测量。( )
①  正确
②  错误
【判断题】 工作分解结构词典是对工作分解结构中每一个要素进行解释。( )
①  正确
②  错误
【多选题】 项目范围计划包括( )
①  项目范围说明书
②  项目章程
③  工作分解结构
④  工作分解结构词典
【多选题】 高质量的工作分解结构应该是( )
①  每个要素的编号规范,名称没有重复
②  便于有效地组织和分配项目工作
③  有利于编制项目后续的计划
④  WBS之内的工作都是必须做的,之外的工作都是必须不做的。