【单选题】【消耗次数:1】
The blizzard continued for a week [] subsequently, they began to run out of food.
comma
semicolon
参考答案:
复制
纠错
相关题目
【判断题】 A line is never begun with a comma, a period or a semicolon.
①  正确
②  错误
【判断题】 Before the conjunctive adverbs there should be a semicolon, not a comma.
①  正确
②  错误
【单选题】 This ATM has been out of service for a few days. It should ____ last week.
①  be fixed
②  have fixed
③  fix
④  have been fixed
【单选题】 This ATM has been out of service for a few days. It should ____ last week.
①  be fixed
②  have fixed
③  fix
④  have been fixed
【单选题】 A: Lets eat out, shall we? B: Im broke. Ive gone through my paycheck for the week already. A: Dont worry. [填空].
①  Lets split the bill
②  We can find a way
③  Its my treat
④  Just fast food
【单选题】 When I got out of the car and walked about among them, ____ one old man who shook his head disapprovingly, they all began to cheer.
①  see that
②  except that
③  provided that
④  except for
【单选题】 They _ on the programme for almost one week before I joined them, and now we on it as no good results have come out so far.
①  had been working; are still working
②  had worked; were still working
③  have worked; were still working
④  have worked; are still working
【单选题】 Using a comma to link two clauses is a common mistake which is called ________.
①  comma fault
②  run-on sentence
③  sentence fragment
【单选题】 She?continued?to( )?her?innocence.
①  assertable
②  assertible
③  asserted
④  assert
【判断题】 A semicolon is used to introduce a quotation or a statemetn.
①  正确
②  错误
随机题目
【判断题】 先张法预应力多采用台座法,台座按构造形式又分为墩式和槽式。
①  正确
②  错误
【判断题】 钢筋绑扎程序是:划线、摆筋、绑扎、穿箍、安放。
①  正确
②  错误
【判断题】 地面水平运输的工具有:搅拌运输车、自卸汽车、机动翻斗车、手推车。
①  正确
②  错误
【单选题】 除锈的方法有电动除锈机除锈、手工用钢丝除锈、砂盘除锈 、喷砂及酸洗除锈。
①  正确
②  错误
【单选题】 与板连接为一体的大截面梁,施工缝应留在板底面以下()。
①  20~30mm
②  10~20mm
③  30~40mm
【单选题】 在施工缝处继续浇筑混凝土时,已浇筑的混凝土抗压强度应不小于()。
①  1.1MPa
②  1.3MPa
③  1.2MPa
④  1.0MPa
【判断题】 入泵前坍落度每小时损失值不应大于30mm,坍落度总损失值不应大于60mm。
①  正确
②  错误
【单选题】 一般抹灰主要有石灰砂浆、水泥石灰砂浆(混合砂浆)及水泥砂浆。
①  正确
②  错误
【判断题】 吊顶的施工程序是弹线定位→安装吊杆→安装与调平龙骨→安装罩面板。
①  正确
②  错误
【单选题】 裱糊工艺过程为:基层处理→裁切壁纸和墙布、墙面画准线→(壁纸或基层)涂刷胶黏剂→上墙裱糊→赶压胶粘剂、气泡。
①  正确
②  错误