【单选题】【消耗次数:1】
18.The garage deals_____ gasoline, oil ,etc. t
with
in
for
about
参考答案:
复制
纠错
相关题目
【单选题】 ____ music is the music that is considered to be serious and of lasting value as opposed to jazz, folk, etc.
①  Domestic
②  Foreign
③  National
④  Classica
【单选题】 18.The tie doesnt ____ my shirtnvery well
①  match
②  fix
③  go
④  fit
【单选题】 18. The earth is about ____ as the moon.
①  as fifty time big
②  fifty times as big
③  as big fifty times
④  fifty as times big
【判断题】 答题说明:句子没有语法错误请选择“正确”,有语法错误请选择“错误”Oil, gasoline and water were added, and the car was ready to be drive away.
①  正确
②  错误
【单选题】 This washing powder will work miracles on these oil ( ).
①  stains
②  stain
③  stained
④  stainless
【单选题】 13.Oil floats if you ______it on water.
①  will pour
②  are going to pour
③  pour
④  poured
【单选题】 Lexicology, a branch of linguistics, deals with_______of words.
①  the nature
②  the history
③  the meaning and use
④  all of the above
【单选题】 How difficult it is ______ the modern world without oil.
①  imagining
②  imagined
③  to imagine
④  having imagined
【单选题】 高速公路上使用ETC电子收费系统后可以自动收费,无需停车,大大节省了排队时间。请问ETC使用了下列哪种技术( )。
①  一维码
②  射频识别
③  二维码
④  条形码
【单选题】 Oil []which is lighter than water, rises to the surface.
①  comma
②  dash
③  brackets
④  semicolon
随机题目
【单选题】 在建设工程常用网络计划表示方法中,( )是以箭线及其两端节点的编号表示工作的网络图。
①  双代号网络图
②  单代号网络图
③  单代号时标网络图
④  单代号搭接网络图
【单选题】 下列选项中,属于施工方进度控制组织措施的是( )。
①  选择承发包模式
②  编制项目进度控制的工作流程
③  工程风险分析
④  进行多方案比较和优化
【单选题】 建设工程项目总进度目标的控制是( )项目管理的任务。
①  施工方
②  业主方
③  设计方
④  供货方
【单选题】 某工程计划中A工作的持续时间为5天,总时差为8天,自由时差为4天。如果A工作实际进度拖延13天,则会影响工程计划工期( )天。
①  13
②  8
③  9
④  5
【单选题】 对于一个建设工程项目而言,( )是管理的核心。
①  设计方的项目管理
②  施工方的项目管理
③  业主方的项目管理
④  供货方的项目管理
【单选题】 下列费用中,不属于施工项目直接成本的是( )。
①  材料费
②  施工机械使用费
③  施工措施费
④  间接费
【判断题】 当费用偏差CV为负值时,即表示项目运行节支。
①  正确
②  错误
【判断题】 当进度偏差SV为正值时,即表示进度提前,即实际进度快于计划进度。
①  正确
②  错误
【判断题】 我国大中型基本建设项目,从项目建议书提出,经过鉴别选择列入前期准备工作开始,直到最终建成投产或交付使用,称为一个项目周期。
①  正确
②  错误
【判断题】 FIDIC合同不是国际通用合同。
①  正确
②  错误