【单选题】【消耗次数:1】
Poor health can be[填空] to unemployment.
own
due
/
lead
参考答案:
复制
纠错
相关题目
【判断题】 If necessary, you can add your own comments and responses in a precis.
①  正确
②  错误
【单选题】 7. She is poor ______ she can hardly get anything to eat.
①  as much as
②  too much so that
③  so much so that
④  much more than
【判断题】 In precis writing, you can rearrange the main points in the orignal passage in your own way.
①  正确
②  错误
【判断题】 Each country has not its own laws about what can or cannot be brought from abroad.
①  正确
②  错误
【判断题】 Unemployment?decreased?steady.
①  正确
②  错误
【判断题】 There was?a?steady?decrease?in unemployment.
①  正确
②  错误
【单选题】 Jan can [填空] a car.
①  drive
②  drives
③  driving
④  drived
【单选题】 A: Can you give me a hand? B: [填空].
①  I can give you both hands
②  Im all yours
③  The pleasure is mine
④  Ill watch your back
【单选题】 He can ride a motorbike, so [填空] I.
①  can
②  do
③  am
④  does
【单选题】 A: How long can I keep the book? B: [填空].
①  Any period longer than four weeks, you will be fined
②  Four weeks, but you can renew it if you need it longer
③  You can check it on the computer over there
④  At most four weeks if you dont mind
随机题目
【单选题】 由于采购代表收受贿赂,而高价买进质量低劣的材料。这一系列活动体现的风险正确的是()。
①  道德风险
②  技术风险
③  经济风险
④  责任风险
【单选题】 风险识别最主要的结果是()。
①  风险来源表
②  风险征兆
③  风险概率初步估计
④  风险预期发生的时间
【单选题】 能较好的反映项目各个环节风险以及之间的影响的风险识别方法是()。
①  核对表
②  流程图
③  WBS
④  情景分析
【单选题】 比较适合新开发项目的风险识别的方法是()。
①  预先分析法
②  情景分析法
③  核对表
④  经验分析法
【单选题】 在建设工程项目的风险类型中,承包方管理人员和一般技工的能力方面的风险属于()类型。
①  经济与管理风险
②  组织风险
③  工程环境风险
④  技术风险
【单选题】 建设项目施工进度风险的常用评价标准是()。
①  关键线路工作窝工天数
②  不能按目标完工的概率
③  某项工作的自由时差
④  不可抗力发生的概率
【单选题】 工程监理方对工程的质量监督负有较大的责任,往往其风险态度属于()。
①  风险中性
②  风险厌恶
③  风险保守
④  乐于冒险
【单选题】 对于工程项目管理而言,风险是指可能出现的()的不确定因素。
①  影响项目目标实现
②  影响项目风险控制
③  影响项目团队建设
④  影响项目组织协调
【单选题】 对决策者的风险态度描述最贴切的是()。
①  决定决策者愿意承受的风险程度
②  决定决策者能够承受的风险程度
③  决定决策者愿意并能够接受的风险策略
④  决定决策者愿意接受风险并组织其应对的策略
【单选题】 对风险事件发生概率的估计方法中,一定程度上反映了个体的自信程度的估计方法是()。
①  理论概论分布
②  主观概率估计
③  综合推断法
④  贝叶斯后验概率