【单选题】【消耗次数:1】
Many people complain of the rapid _____ of modern life.
rate
speed
pace
growth
参考答案:
复制
纠错
相关题目
【单选题】 Reforms have brought about rapid [] growth in China in recent years.
①  economical
②  economic
【单选题】 The postage rate was high in the past, because post offices had to send many people to_________ the postage.
①  cover
②  carry
③  clean
④  collect
【单选题】 With the rapid development of the economy, all ( ) of our life have changed.
①  filed
②  fileds
③  aspect
④  aspects
【单选题】 Life is often compared ______ a stage by many writers.
①  like
②  as
③  with
④  to
【单选题】 —How many people are there in Changsha?—About six ______.
①  million
②  millions
③  millions of
【判断题】 There have many people outside the room.
①  正确
②  错误
【单选题】 How many major ( ) can you play in your daily life?
①  members
②  roles
③  aspects
④  identities
【单选题】 33.Modern science and technology has _____ communication between people far apart.
①  madeconvenient
②  madeitconvenient
③  madeitconvenientfor
④  madeitconvenientto
【判断题】 When efficiency and formality are in conflict, the fast-paced modern people often sacrifice the latter.
①  正确
②  错误
【单选题】 Many people dream ___________ living on an island in the South Sea.
①  of
②  in
③  over
④  beyond
随机题目
【单选题】 下列哪项属于护理研究项目申请书封面的内容
①  项目名称
②  负责人
③  所在单位
④  以上都是
【单选题】 下列哪项不属于护理研究项目申请书的可行性
①  研究项目的实验条件扣研究能力没有基本成熟的
②  内容方法是可行的
③  拟采用的技术路线是合适的
④  项目所依据的理论和事实的根据是科字和客观的
【单选题】 下列哪项属于护理研究项目申请书技术路线的特点
①  以时间顺序为主线设计技术路线
②  以研究内容为主线设计技术路线
③  详细的写清楚具体步骤
④  以上都是
【单选题】 品管圈(QCC)的特点不包括
①  一群工作性质相似、2-3人组成小组
②  以PDCA管理循环为基础
③  圈员自我启发、脑力激荡、团队合作
④  选定质量改进主题
⑤  善于统计数据及及运用品管工具进行持续性改进活动
【单选题】 品管圈创始人是( )
①  戴明
②  波拉
③  阿基米德
④  石传馨
【单选题】 品管圈活动分为两种
①  问题解决型和课题达成型
②  现场型和管理型
③  服务型和攻关型
④  创新型和管理型
【单选题】 品管圈活动起源于( )
①  美国
②  日本
③  中国
④  德国
【单选题】 PDCA循环管理中的D和A分别指什么
①  计划和实施
②  实施和处理
③  检查和处理
④  计划和处理
【单选题】 Logistic回归适用于
①  影响因素、危险因素分析
②  预测疾病是否发生及发生的概率
③  疾病的诊断和分类
④  以上都是
【单选题】 非参数化模型不包含
①  COX比例风险模型
②  分类树回归
③  神经网络
④  随机森林