【单选题】【消耗次数:1】
—I’m sorry to keep you waiting. —Oh, not at all. I___ here only a few minutes.
have been
had been
was
will be
参考答案:
复制
纠错
相关题目
【单选题】 -- Sorry I kept you waiting.
①  I’m sad
②  I don’t care
③  That’s all right. There’s no hurry
④  No, not at all
【单选题】 A: How long have you been here?B: Not for long, only about five minutes. Alice and Monica ______ here with me.
①  have walked
②  had walked
③  were walking
④  walked
【单选题】 A: Im sorry to have kept you waiting. B: [填空].
①  It doesnt matter
②  Dont mind
③  My pleasure
④  Youre welcome
【判断题】 A: Sorry, Mr. Thomas left here just a few minutes ago. B: May I take a message?
①  正确
②  错误
【单选题】 I came to?Beijing?in 1991 and have been ?[填空] here ever since.
①  live
②  lives
③  lived
④  living
【单选题】 -I’m sorry I broke your mirror.-Oh, really? ____.
①  It’s OK with me
②  It doesnt matter
③  Don’t be sorry
④  I don’t care
【判断题】 A: Have you been wasting time on computer games again? B: Not really. I’ve been studying a lot and I need a break.
①  正确
②  错误
【单选题】 Oh, I’m sorry. But I promise I’ll be careful next time.
①  It’s nothing at all
②  Oh, never min
③  It doesn’t matter
④  Thank you
⑤  There are no questions
【单选题】 I hope ___ the little ___ I have been able to do has been of some use.
①  that; that
②  /; by which?
③  what; what
④  /; with which
【单选题】 How stupid I have been! Why _______ I do that before?
①  don’t
②  didn’t
③  not
随机题目
【单选题】 楼(地)面砂浆防水(防潮)楼(地)面防水反边高度≤()mm算作地面防水,反边高度()mm按墙面防水计算
①  300300
②  200200
③  250250
④  350350
【单选题】 根据清单工程量计算规范,脚手架工程量应按()计算
①  工期日历天数
②  构件接触面积
③  模板接触面积
④  垂直投影面积或建筑面积
【单选题】 锯齿形楼梯底板抹灰按()面积计算
①  展开
②  水平投影
③ 
④  垂直投影
【单选题】 屋面卷材防水的项目特征不包括()。
①  卷材品种、规格、厚度
②  防水层数
③  增强材料种类
④  防水层做法
【单选题】 某工程量清单项目编码是020401001002,其中表示砖砌体的代码是()。
①  02
②  04
③  01
④  001
【单选题】 非砖墙平砌砖过梁计算公式正确的是()。
①  V=(L+0.5)×0.44×b
②  V=(L+0.44)×0.5×b
③  V=(L+0.0.5)×0.5×b
④  V=(L+0.44)×0.44×b
【单选题】 单层建筑物高度不足2.2m者,()建筑面积
①  计算1/2
②  不计算
③  但高度大于1.2m时计算1/2
④  全算
【单选题】 人工费单价中不包括下列哪些选项()
①  奖金,津贴补贴
②  计时工资、计件工资
③  加班加点工资
④  职工福利费
【单选题】 某施工过程的基本工作时间为30min,辅助工作时间为5min,准备与结束工作时间为10min,不可避免的中断时间为5min,必要的休息时间为5min,则定额时间为()min。
①  35
②  55
③  45
④  50
【单选题】 不是建设工程定额特点的是()
①  科学性特点
②  系统性特点
③  法令性特点
④  稳定性和时效性