【单选题】【消耗次数:1】
They had only _________ in that house for three weeks when fire destroyed it.
to live
living
lived
been lived
参考答案:
复制
纠错
相关题目
【单选题】 They had only _________ in that house for three weeks when fire destroyed it.
①  to live
②  living
③  lived
④  been lived
【单选题】 Only when we landed______ how badly the plane had been damaged.
①  we realized
②  did we realize
③  had we realized
④  we had realized
【单选题】 The residents, _____had been damaged by the fire, were given help by the Red Cross.
①  all of their homes
②  all their homes
③  whose all homes
④  all of whose homes
【单选题】 The fire was finally brought under control, but not _______extensive damage had been caused.
①  after
②  before
③  since
④  as
【单选题】 The residents, _____had been damaged by the fire, were given help by the Red Cross.
①  all of their homes
②  all their homes
③  whose all homes
④  all of whose homes
【单选题】 When a fire____ at the National Exhibition in London, at least ten priceless paintings were completely destroyed.
①  broke off
②  broke out
③  broke down
④  broke up
【单选题】 What a rainy summer we’ve had! --Yes, there only three sunny weekends the whole summer.
①  have been
②  are
③  had been
④  has been
【单选题】 22. When a fire ______ at the National Exhibition in London, at least ten priceless paintings were completely destroyed.
①  broke off
②  broke out
③  broke down
④  broke up
【单选题】 My teacher had been with me several weeks before I understood that everything has a name.
①  A.在我知道每样东西都有一个名字以前,老师已经教我好几个星期了。
②  B.老师和我相处了好几个星期,我都不知道每样东西还有一个名字。
③  C.在我知道每样东西都有一个名字以前,老师和我已经相处好几个星期了。
④  D.老师教了我好几个星期,我才知道每样东西都有一个名字。
【单选题】 The prince and princess got married and lived happily ( ).
①  ever after
②  even if
③  now that
④  provided that
随机题目
【单选题】 网络计划的()就是网络计划终点节点的标号值
①  要求工期
②  计算工期
③  计划工期
④  指令工期
【单选题】 我国于()年开始推行建设工程监理制度。
①  1983
②  1985
③  1988
④  1990
【单选题】 做为成本管理中其他各环节依据的是()。
①  成本预测
②  成本计划
③  成本核算
④  成本分析
【单选题】 ()是银行为承包商参加投标竞争提供的信誉保证书。
①  投标保函
②  履约保函
③  预付款保函
④  工程维修保函
【单选题】 施工成本管理的任务主要有六项,其中应贯穿施工项目从投标阶段开始直至项目竣工验收全过程的是()。
①  施工成本控制
②  施工成本预测
③  施工成本考核
④  施工成本计划
【单选题】 对工程变更进行估价时,若由于工程变更和工程量表上实际工程量增加,导致合同价格的增加,超过有效合同价的15%时,应在合同价中()。
①  加上承包商和工程师议定的一笔款额
②  减去承包商和工程师议定的一笔款额
③  减去超过有效合同价15%的那一部分款额
④  加上承包商增加的现场管理费用和公司管理费用
【单选题】 便于掌握的施工成本分析方法是()。
①  因素分析法
②  比率法
③  经验法
④  比较法
【单选题】 PDCA循环中,D(Do)是指()。
①  明确目标并制订实现目标的行动方案
②  展开工程的作业技术活动
③  对计划实施过程进行各种检查
④  对质量问题进行原因分析,采取
【单选题】 网络计划中某项工作进度拖延的时间为5天,该工作的总时差为3天,自由时差为1天,则该工作影响总工期()
①  1天
②  2天
③  4天
④  5天
【单选题】 卫生间地面渗漏试验记录不正确的是()
①  厕所、卫生间(必要时厨房)蓄水试验记录,抽查20%房间
②  如无渗漏则工程认为渗漏试验合格
③  如有一个房间渗漏,修补后加倍数量检验
④  如仍有不合格,则全部房间试验